Road work done by Pablo Rios and crew on July 17, 2025.
Work included jack hammering large protruding boulders, applying six loads of millings, grading and rolling the millings, patching a hole in the entry pavement, and digging out and clearing drainage ditches. Thank you for a job well done!
Total Cost: $8645.80