Pictures of work done on Woodpecker Lane and Spring Park Trail on July 14 and July 15, 2025.
The road was graded away from a home on Woodpecker Lane to address flooding that was occurring, while at the same time improving the hill leading up to Tulip Tree Lane and Woodpecker Lane.
Work included digging out a ditch on the east side of Woodpecker Lane, preparing the road on Woodpecker Lane and Spring Park trail, installing two loads of millings, grading the millings and rolling the millings.
Total cost: $6480.00